PULLING AN ORE STEAMER OUT OF POE LOCK: SOO CANAL
At Panama steamers are moved by electric towing engines operating
on tracks on the lock walls. At the Soo Canal tugs perform this
towing service when it is needed. Note the big lake passenger
ships approaching in the background.
Tribute Page
| Contents Page
|